The scope of the assignment is:
• The installation of the offshore pipeline section. Approximately 20 km. The primary pipe configuration is a 16 inch nominal diameter, MLPP anti corrosion & thermal insulation coating with a concrete weight coating on top of the MLPP.
• The execution of the shore crossing by pipe pull through a pre-installed HDPE carrier pipe.
• The fabrication and installation of the subsea spool pieces & the related tie-in to the riser.
• Trenching and backfilling
• Pre-commissioning activities from onshore battery limit to the top of the riser (flanged connection).