Deze aanbesteding is gegund of beƫindigd. Ga voor meer informatie over deze aanbesteding naar de website van http://gasunie.supplier.ariba.com
Details
Publicatie
Documenten
Vraag en antwoord
Omschrijving
The scope of this contract is divided into two lots. The contracts are for:
1. the timely delivery and temporary storage of insulated materials (max. three suppliers). These materials in diameters vary from DN300 - DN700.
2. The timely delivery and temporary storage of non-insulated materials for the realisation of WarmtelinQ pipeline (max. two suppliers).
For lot 2 a backup contract will be awarded.