This tender relates to Nuon’s intention to develop, design, engineer, construct, commission and deliver a up to 120 MW -biomass fired- heat only boiler at its existing location in Diemen, connected to the Amsterdam area district heating grid. With this new plant, Nuon aims to produce a significant amount of green heat. The heat produced by the new facility will be used to fulfil base load heat demand.