The Engagement includes the following tasks and responsibilities:
• It concerns a need of the entire Royal Schiphol Group for a phased replacement of the asset
base.
• It concerns the replacement of the existing ETDs at various (mobile) locations within the terminal and beyond, serving as a security measure. The replacement of the carts on which the ETDs
are placed is also included in this project.
• This involves physical networking, the development of or integration into a management environment, and the potential for data integration into other systems for process and system monitoring.