Gasunie intends to conclude a contract in which it wants to procure renewable energy produced by Dutch wind farms.
The scope of this contract is to establish the delivery of 25 MW as a baseload volume for the first period (1-x-2024 – 31-12-2024) for which the start month is flexible depending on when party can start the delivery of the requested volume. The total volume in period 1 depends on the start date of the contract, but always starting on the first of any given month in 2024. For the remaining 4 years (01-01-2025 till 31-12-2028), a volume of 250 GWh/year with a maximum capacity of 78 MW as an as-nominated profile (period 2) will be delivered to Gasunie’s electricity portfolio. The electricity shall be delivered to Gasunie from an existing/starting Dutch wind farm. With this purchase, the associated traceable GoO's are also acquired.
For more information about the procedure, contract and how to receive the tender documents please see the uploaded document on Tender.